| | BANGUNAN TAMBAHAN RTB - PEMBINAAN BLOK OPERASI PENYIARAN DAN DEWAN SERBAGUNA STUDIO DI KOMPLEKS PENYIARAN RTB SUNGAI AKAR - DESIGN AND BUILD
| 15HB JANUARI 2025 DAN 22HB JANUARI 2025 | 17/06/2025 | JKR/DTS/44/CQS/2024-T/VI | |
| | PERKHIDMATAN PERUNDING KEJURUTERAAN AWAM DAN STRUKTUR BAGI KAJIAN AWAL UNTUK PROJEK PERLINDUNGAN PANTAI.
| 05hb Mac 2025 dan 12hb Mac 2025 | 24/06/2025 | JKR/RFQ/DDS/09/2025 | |
| | KERJA-KERJA MENAIKTARAF SALIRAN DI SUNGAI TEMBURONG FASA 1
| 26HB MAC 2025 DAN 02HB APRIL 2025 | 24/06/2025 | JKR/DDS 013/2025-(CDE).T.V | |
| | REQUEST FOR QUOTATION (RFQ) - PERKHIDMATAN PERUNDING BAGI PELAN INDUK SANITASI DAN PEMBETUNGAN BAGI NEGARA BRUNEI DARUSSALAM
| 26HB MAC 2025 DAN 02HB APRIL 2025 | 01/07/2025 | JKR/RFQ/DDS/10/2025 | |
| | REQUEST FOR QUOTATION (RFQ) CIVIL AND STRUCTURAL ENGINEERING CONSULTANCY SERVICES FOR BRUNEI DARUSSALAM DRAINANGE MASTER PLAN, SG BELAIT AND TEMBURONG FLOODPLAIN MANAGEMENT STUDIES.
| 09HB APRIL 2025 DAN 16HB APRIL 2025 | 24/06/2025 | JKR/RFQ/DDS/11/2025 | |
| | PENYAMBUNGAN PAIP PEMBENTUNGAN BAGI KAWASAN LUMUT FASA 2
| 16hb April 2025 dan 23hb April 2025 | 08/07/2025 | JKR/DDS/ 015/2025 - (SEW).T.IV | |
| | KONTREK PENGGAL BAGI KERJA-KERJA PENAMBAHBAIKAN SALIRAN BERSEPADU, NEGARA BRUNEI DARUSSALAM
| 16hb April 2025 dan 23hb April 2025 | 17/06/2025 | JKR/DDS 016/2025 - (CDE).T.V | |
| | PENGALIRAN AIR - MEMBINA STESEN PAM SALIRAN DI F17, SERIA. (DESIGN AND BUILD)
| 07HB MEI 2025 DAN 14HB MEI 2025 | 01/07/2025 | JKR/DBSKB/006/2025 | |
| | MENAIKTARAF LOJI RAWATAN KUMBAHAN LOS TANJONG, KUALA BELAIT
| 23hb April 2025 dan 30hb April 2025 | 24/06/2025 | JKR/DDS 017/2025 - (SEW).T.IV | |
| | REQUEST FOR QUOTATION (RFQ) FOR ARCHITECT CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 17/06/2025 | JKR/RFQ/DOD/12/2025 | |
| | REQUEST FOR QUOTATION (RFQ) FOR CIVIL AND STRUCTUTAL ENGINEERING CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 17/06/2025 | JKR/RFQ/DOD/13/2025 | |
| | REQUEST FOR QUOTATION (RFQ) FOR MECHANICAL AND ELECTRICAL ENGINEERING CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 17/06/2025 | JKR/RFQ/DOD/14/2025 | |
| | REQUEST FOR QUOTATION (RFQ) FOR QUANTITY SURVEYING CONSULTANCY SERVICES FOR "KAMPUS KEKAL POLITEKNIK BRUNEI"
| 30HB APRIL 2025 DAN 07HB MEI 2025 | 17/06/2025 | JKR/RFQ/DOD/15/2025 | |
| | KERJA-KERJA PEMBAIKAN DAN PENGUBAHSUAIAN TAPAK SEMAIAN BELIMBING, JABATAN ALAM SEKITAR, TAMAN DAN REKREASI.
| 12HB MEI 2025 DAN 19HB MEI 2025 | 29/07/2025 | JASTRE/BL/DB/01/2025 | |
| | MENAIKTARAF GELANGGANG TENIS, KOMPLEKS SUKAN NEGARA HASSANAL BOLKIAH
| 14HB MEI 2025 DAN 21HB MEI 2025 | 24/06/2025 | JKR/DBSBM007/2025 | |
| | MENAIKTARAF RANGKAIAN PAIP SISTEM VAKUM BAGI RPN KG LUMUT
| 21HB MEI 2025 DAN 28HB MEI 2025 | 29/07/2025 | JKR/DDS 018/2025-(SEW).T.V | |
| | KERJA-KERJA PENGGANTIAN PERALATAN HAWA DINGIN DI BANGUNAN GALERI (GKDYMM), JABATAN PERDANA MENTERI
| 21HB MEI 2025 DAN 28HB MEI 2025 | 17/06/2025 | JKR/DME/BOP-ACM/14/2025 | |
| | MEMBEKAL SATU (1) UNIT KENDERAAN '7-SEATERS 4WD', JABATAN PERKHIDMATAN TEKNIKAL, JABATAN KERJA RAYA
| 28hb Ogos 2024 dan 04 September 2024 | 24/06/2025 | JKR/DME/BOP-ME/18/2025 | |
| | MEMBEKAL SATU (1) UNIT 'JETTING/VACUUM TANKER' UNTUK BAHAGIAN PEMBETUNGAN, JABATAN SALIRAN DAN PEMBETUNGAN
| 28HB MEI 2025 DAN 04HB JUN 2025 | 24/06/2025 | JKR/DME/BOP-ME/19/2025 | |
| | MEMBEKAL LIMA (5) UNIT KENDERAAN '7-SEATERS 4WD', JABATAN PERKHIDMATAN MEKANIKAL DAN ELEKTRIKAL, JABATAN KERJA RAYA (FASA 2) - TAWARAN SEMULA
| 28HB MEI 2025 DAN 04HB JUN 2025 | 24/06/2025 | JKR/DME/BOP-ACM/20/2025 | |
| | PENYELENGGARAAN LANDSKAP DI TAMAN REKREASI MENTERI BESAR BAGI TEMPOH TIGA (3) TAHUN.
| 02HB JUN 2025 DAN 09HB JUN 2025 | 01/07/2025 | JASTRE/BTR/T012/2025 | |
| | KERJA-KERJA PEMBAIKAN DAN PENGUBAHSUAIAN BARIK ELEKTRIK GADONG, JALAN GADONG BLOK A, B & C (JKR NO. 401, 402, 403) - FASA 2 (BLOK A & B)
| 11HB JUN 2025 DAN 18HB JUN 2025 | 08/07/2025 | JKR/DBSBM011/2025 | |
| | BINA DAN REKABENTUK BAGI IBU PEJABAT PIHAK AUTORITI KEBANGSAAN KESELAMATAN, KESIHATAN DAN ALAM SEKITAR (SHENA) DI BANGUNAN BLOK B2 FLAT PERUMAHAN KERAJAAN KG BERIBI
| 04HB JUN 2025 DAN 11HB JUN 2025 | 01/07/2025 | JKR/DBSBM010/2025 | |
| | KERJA-KERJA MEMBAIKPULIH BANGUNAN BLOK B (JKR 1726), KOMPLEKS PASUKAN GERAK KHAS, KOMPLEKS IBU PEJABAT PASUKAN POLIS DIRAJA BRUNEI, GADONG
| 04HB JUN 2025 DAN 11HB JUN 2025 | 01/07/2025 | JKR/DBSBM009/2025 | |
| | KONTRAK PENGGAL BAGI OPERASI DAN PENYELENGGARAAN UNTUK TIGA PAM SALIRAN DI JABATAN KERJA RAYA, KUALA BELAIT BAGI TEMPOH 24 BULAN. (RETENDER)
| 28HB MEI 2025 DAN 04HB JUN 2025 | 24/06/2025 | JKR/DBSKB/015/2025 | |
| | KONTREK PENGGAL OPERASI DAN MENYELENGGARA LOJI RAWATAN AIR SERIA DAN STESEN PAM AIR MENTAH BADAS PERINGKAT 4 DI DAERAH BELAIT UNTUK 36 BULAN.
| 28HB MEI 2025 DAN 04HB JUN 2025 | 24/06/2025 | JKR/DBSBKB/014/2025 | |
| | MENAIKTARAF SISTEM PEMBETUNGAN BAGI MUKIM KUALA BELAIT DAN MUKIM SERIA, DAERAH BELAIT - KERJA-KERJA PEMULIHAN SISTEM PEMBETUNGAN DI KAWASAN KUALA BELAIT DAN SERIA.
| 28HB MEI 2025 DAN 04HB JUN 2025 | 24/06/2025 | JKR/DBSKB/016/2025 | |
| | KONTRAK PENGGAL BAGI OPERASI DAN KERJA-KERJA PEMELIHARAAN SISTEM HAWA DINGIN BAGI BANGUNAN DEWAN MAJLIS, BAGI TEMPOH TIGA (3) TAHUN
| 04HB JUN 2025 DAN 11HB JUN 2025 | 01/07/2025 | JKR/DME/BOP-ACM/15/2025 | |
| | KONTRAK PENGGAL BAGI OPERASI DAN KERJA-KERJA PEMELIHARAAN SISTEM HAWA DINGIN BAGI 'GROUP LOCATION 1' UNTUK TEMPOH TIGA (3) TAHUN
| 04HB JUN 2025 DAN 11HB JUN 2025 | 01/07/2025 | JKR/DME/BOP-ACM/16/2025 | |
| | KONTRAK PENGGAL BAGI PEMASANGAN HAWA DINGIN SPLIT UNIT DI BANGUNAN-BANGUNAN KERAJAAN BAGI TEMPOH DUA (2) TAHUN
| 04HB JUN 2025 DAN 11HB JUN 2025 | 01/07/2025 | JKR/DME/BOP-ACM/17/2025 | |